    How Much Do San Diego Developers Charge? Development Fees Explained

    By Ground Zero Development•

    Ground Zero Development charges a fee of 3% to 6% of total project cost, depending on project difficulty, location, and size. The fee is paid in stages, the fee structure is provided in writing before design begins, and the initial feasibility review carries no obligation.

    Key takeaways

    • The development fee is a percentage of total project cost, typically 3% to 6%.
    • Difficulty, location, and size decide where a project lands in that range.
    • The fee is paid in stages, and the structure is provided in writing before design begins.
    • A free feasibility review comes first, so you see the numbers before committing.
    • Ask any developer exactly what the fee includes and when it is paid.

    How a percentage-of-cost fee works

    A percentage-of-cost fee means the developer's fee scales with the project's size. Here is the simple math, using illustrative project costs only.

    Total project costFee at 3%Fee at 6%
    $2,000,000$60,000$120,000
    $5,000,000$150,000$300,000
    $10,000,000$300,000$600,000

    These are examples of how the percentage translates to dollars. They are not quotes for any specific project.

    What decides where your project lands between 3% and 6%

    Three factors move the percentage.

    • Project difficulty. Complex sites, tight constraints, and heavier entitlement work take more effort and more time.
    • Location. The neighborhood and its general path to approval affect the work required.
    • Size. Project scale changes how the fee is structured relative to total cost.

    Every site, project scope, client, capital stack, and desired outcome is different. We take into account how all these factors compound to assess a project's full scope.

    Carl Dumesle, CEO, Ground Zero Development

    What the fee covers

    Ground Zero runs every stage of a project: acquisition, design, construction, and stabilization. Ground Zero is also the builder, so you work with one accountable team instead of separate consultants and contractors.

    Included in the development fee:

    • Pre-development analysis of what the right product is for the market
    • Design coordination with the architect
    • Entitlements and permitting management
    • Construction oversight against a phase-by-phase schedule
    • Progress reporting to the owner
    • Stabilization and lease-up coordination with the property manager

    Paid separately:

    • Architecture and engineering fees
    • City permit and impact fees
    • Land and financing costs
    • Property management and lease-up fees

    How the fee is paid: in stages, not all upfront.

    The feasibility review is free and happens before any fee applies.

    Why the feasibility review comes first

    Before any fee is discussed, you can request a free feasibility review. Send a San Diego lot address and Ground Zero reports the maximum buildable units, an estimated budget, and projected rent within 2 business days. There is no obligation.

    This lets you see whether the project works financially before you commit to anything.

    Questions to ask any developer about fees

    Use these whether you work with Ground Zero or anyone else.

    • What exactly does the fee include, and what is billed separately?
    • Is the fee a percentage of total project cost, a flat amount, or something else?
    • When is the fee paid: upfront, in stages, or at completion?
    • What happens to the fee if the project cost changes?
    • Is the fee structure provided in writing before design begins?

    First-time investors often forget to include the developer fee in their soft cost budget, and that comes right out of the bottom line.

    Carl Dumesle, CEO, Ground Zero Development

    Frequently asked questions

    How much does Ground Zero Development charge?
    The fee is a percentage of total project cost, typically between 3% and 6% depending on project difficulty, location, and size. The fee structure is shown in writing before design begins, and the feasibility review carries no obligation.
    Is the fee based on project cost or a flat rate?
    It is based on a percentage of total project cost, so the dollar amount grows with the size of the project.
    When is the fee paid?
    In stages, not all upfront.
    What does the fee not include?
    Architecture and engineering fees, City permit and impact fees, land and financing costs, and property management and lease-up fees are paid separately.
    Is Ground Zero also the builder?
    Yes. Ground Zero handles construction directly, so there is no separate general contractor to coordinate.
    Do I pay anything for the feasibility review?
    No. The feasibility review is free and carries no obligation. You send a lot address and receive maximum buildable units, an estimated budget, and projected rent within 2 business days.
    When do I see the fee in writing?
    Before design begins.
    What drives the fee up or down?
    Project difficulty, location, and size.

    Next step

    Want to see what your lot can support before you talk fees? Request a free feasibility review.

    Ground Zero Development is a San Diego real estate developer that builds ground-up multifamily and ADU projects and legalizes unpermitted construction through retroactive permitting.

    development feesSan Diego developerproject costmultifamilyADU