
We develop high-performing ADUs designed to maximize rental potential and strengthen long-term property value. Through strategic feasibility, thoughtful unit-mix planning, and disciplined execution, we create beautiful, income-producing spaces that prioritize tenant appeal and management efficiency.
A successful ADU begins with the right strategy. Unit mix, tenant demand, construction costs, and long-term operating efficiency all play a role in determining how the addition will perform.
Ground Zero helps investors and portfolio owners evaluate those factors before committing capital. From early feasibility and underwriting through design, permitting, construction, and delivery, we manage the full development process with a clear focus on creating a well-positioned, income-producing asset.
We align strategy, design, and execution to support the long-term performance of your investment.
Analyzing zoning allowances, comparable rents, tenant demand, and construction costs to identify the unit configuration best aligned with your property and investment goals.
Creating beautiful, functional layouts designed to attract quality tenants while supporting long-term management and maintenance efficiency.
Managing each phase of construction with disciplined oversight of budget, schedule, and quality to deliver a durable, rent-ready asset.
A disciplined, full-cycle approach that treats every ADU as both a development project and a long-term investment.
We assess the property's zoning, lot conditions, access, and development potential alongside your broader investment goals.
We evaluate projected rents, development costs, comparable properties, and potential returns to establish a clear path forward before capital is committed.
We develop a thoughtful design that balances tenant appeal, rentability, construction efficiency, and long-term operations.
We coordinate the permitting and approval process, proactively managing requirements that could affect the project timeline or budget.
We oversee construction from groundbreaking through completion, maintaining clear communication and disciplined control of cost, schedule, and quality.
We deliver a fully completed, rent-ready unit prepared for a smooth transition into leasing and ongoing property management.
Common questions about ADU development in San Diego
We manage the full ADU development process for San Diego property owners and investors: feasibility and underwriting, design, permitting, construction, and delivery of a rent-ready unit. We evaluate zoning, comparable rents, and construction costs before you commit capital, so the unit mix fits your return target.
Costs vary by size, site conditions, utilities, and finish level. Recent Ground Zero ADU projects have ranged from $300 to $350 per square foot. We provide a project-specific budget during underwriting, before design begins.
A typical ADU takes 9 to 12 months from design to delivery: about 2 months for design, 4 to 6 months for City permitting, and about 6 months for construction. Permit review time is the least predictable phase, so we plan a schedule around current City timelines and update it as approvals land.
It can be, depending on your lot, build cost, and local rents. San Diego's tight housing supply supports rental demand, but returns vary by neighborhood and unit design. Our underwriting phase models projected rent, development cost, and return so you can decide with numbers before spending on design.
Allowed size and type depend on your lot, zoning, existing structures, and utilities. We build detached, attached, and garage conversion ADUs. We assess your property in the first phase and tell you what is permitted and what performs best.
Yes. Ground Zero coordinates design, City permitting, and construction, with one team accountable for budget, schedule, and quality. You do not need to hire separate architects, expeditors, and contractors. We deliver a completed unit ready for leasing.
Yes. For duplexes, fourplexes, and small apartment buildings, see our White Glove Development service. We also legalize unpermitted construction through retroactive permitting.
Send us an address. We reply within 2 business days.
No cost, no obligation.